Thursday, 30 January 2014
Second Edit - Title Sequence: Sisters of Darkness
This is the second updated edit of our title sequence which we have received feedback for and will make further changes to.
Wednesday, 29 January 2014
Title Sequence - Rough Edit
This is a rough edit of our Title sequence. The titles and soundtrack for the sequence is still yet to be added . There are also a few scenes that we need to include and one scene left to film to make up the 2 minute footage.
Saturday, 25 January 2014
Source of inspiration
Eminems 3am music video contains a lot of Genre Conventions we would like to use as Enigma Codes in our Title Sequence.
For example we see Eminem in a bath full of red liquid which we automatically associate with blood, this suggests a dark and scary tone which is what we're aiming for with our final product.
We also see knives and footprints on the ground which suggests a crime has taken place.
The settings also suggest a horror as they are set in mysterious and dark places.
Friday, 24 January 2014
Day 5 - Filming
This was our last day of filming and we filmed our garage scene. This went well because we were fully equipped with all the props and accessories needed to make it look quite realistic. the filming could have been even better if we had enough time to re film certain parts such as when 'Agnesa' cuts up another character. the filming was successful, although it was a dark scene we were able to get a portable light source so that the main character can still be seen and the lighting also enhanced the sense of importance. The garage fitted perfectly with the sort of atmosphere we were trying to create.
Tuesday, 21 January 2014
Day 4 Filming
We filmed the next part of our title sequence in a bathroom and living room this would have went a lot better if we hadn't forgotten a tripod because this part was quite complicated to film and it was very risky as we were filming an extreme close up of water flowing into the bathtub but other than that we were able to experiment filming at different angles to add effect and add an abstract element. We also filmed scenes of the characters walking through the door so we experimented with the levels and the angles to take it from simply by recording on a set of stairs to get a better view.
Tuesday, 14 January 2014
Day 3 of Filming
Today we completed the filming needed at our second location! We were able to film the bar scene and the staff were working as normal which helped it seem more realistic. The first half of our sequence has been filmed. 


Thursday, 9 January 2014
Filming - Day 2
We filmed outside of our second location to make sure we had extra coverage of the area to build up on when editing our title sequence.
Wednesday, 8 January 2014
Filming - Day 1
Our first day of filming has been very productive!
We filmed the beginning of our title sequence at our first location and we also managed to get the permission needed to film the bar scene.
It would have been better if we got the chance to travel further to film this part of the sequence and if we could get equipment to be able to film a tracking shot for this part of the sequence because filming it by hand would mean that the footage would be shaky and unprofessional.
Tuesday, 7 January 2014
Monday, 6 January 2014
Sunday, 5 January 2014